Blog / topic
Updates & control
Monthly updates, baselines, variance, and schedule health. 9 articles.
-
Baselines: When to Set Them and When to Re-Baseline
What a schedule baseline is for, when to set it, what counts as a valid reason to re-baseline, and how to do it without losing the record.
-
Earned Value for Construction Schedulers
Planned value, earned value, actual cost, SPI and CPI explained with a worked construction example, plus where earned value misleads schedulers.
-
How to Run a Monthly Schedule Update
A step-by-step process for the monthly CPM update: collecting progress, setting the data date, checking logic, and writing a narrative people read.
-
Out-of-Sequence Progress and How to Clean It Up
Why out-of-sequence progress happens, how to find it in an update, and the four ways to fix the logic so the critical path stays honest.
-
Reading Schedule Variance: What Slipped and Why
How to trace a milestone slip back through the driving path, separate late starts from long durations, and explain variance in plain terms.
-
Retained Logic vs. Progress Override
What retained logic and progress override actually do to out-of-sequence work, with a worked example showing how each changes the finish date.
-
Running Weekly Meetings Off the Schedule
How to run a weekly subcontractor or OAC meeting from the CPM schedule and lookahead, with an agenda, prep checklist, and what to record.
-
The DCMA 14-Point Assessment, Explained for Construction
Each of the DCMA 14 schedule checks, what it measures, the usual threshold, and how to read the results on a construction schedule.
-
The Data Date, Explained
What the data date is, how it splits actuals from forecast, the rules every update must follow, and the mistakes reviewers catch first.