-
A Superintendent's Guide to Reading a CPM Schedule
What the columns, bars, and float numbers on a CPM schedule mean in the field, and which parts a superintendent should check every week.
-
Connecting Pull Plans Back to the Master Schedule
How to bring what a pull planning session learned back into the CPM schedule: durations, logic, milestones, and float, without running two schedules.
-
How to Build a Three-Week Lookahead from the CPM Schedule
A practical method for cutting a three-week lookahead out of the master schedule, breaking it down for the field, and keeping the two in sync.
-
How to Run a Pull Planning Session
How to prepare, facilitate, and close out a pull planning session so the trades leave with a sequence they built and will actually work to.
-
Make-Ready Planning and Constraint Logs
How to screen lookahead work for constraints, run a constraint log people keep up, and clear the way before a crew shows up to a task it can't start.
-
Percent Plan Complete (PPC) and Reasons for Variance
How to calculate PPC, how to record reasons for variance that lead somewhere, and why a high PPC doesn't mean the job is on schedule.
-
The Last Planner System: An Overview for Schedulers
What the Last Planner System is, how its five planning levels fit together, and where it meets the CPM schedule a scheduler already maintains.