Construction scheduling features

Critical path method in the browser. Interactive Gantt. Imports from the files schedulers already use. Lookaheads, pull planning, baselines, and owner share links — without turning into another PM suite.

Critical path & interactive Gantt

Real CPM in the browser — total float, critical path, constraints, and lag. Drag bars, resize durations, and draw Finish-to-Start links on the chart. A labeled schedule ribbon groups File, Edit, Analysis, View, and Share so the commands stay findable on busy jobs. WBS, activity codes, calendars, and bulk edits stay in the same workspace.

  • Gantt, network diagram, calendar, and timeline views
  • Labeled ribbon with Export and More menus
  • Gantt + network dual pane for logic review
  • Critical-path filter, zoom, saved layouts
  • Virtualized rows for large schedules (thousands of activities)
schedule.construction Gantt with File/Edit/Analysis/View ribbon, critical path bars, predecessors, float, and activity links for Riverside Tower Phase 2
Interactive Gantt with a labeled ribbon, critical path highlighting, and dependency links.

Import, export & print

Schedulers live in .xer and .mpp files. Import Primavera P6 (.xer), Microsoft Project XML (MSPDI), and Excel — then see exactly what was accepted, dropped, or remapped in the import trust report. Export from the File ribbon back to Excel, XER, PMXML, CSV, SVG, or a multi-page Gantt print pack.

  • P6 .xer import and export
  • MS Project XML and Excel import
  • Native .mpp import — coming soon
  • Import trust report for every file
  • Export menu: Excel, MSPDI, XER, PMXML, CSV, SVG, PDF
  • Multi-page Gantt print pack (PDF)
File ribbon Export menu open with Excel, MSPDI, P6 XER, PMXML, CSV, SVG, Print PDF, and network export options
File ribbon Export menu — formats schedulers already hand off.

Lookaheads

A rolling short-interval window over the live schedule — critical and near-critical work for the next few weeks, without leaving the project. Built for weekly coordination, not a separate spreadsheet ritual.

  • Configurable lookahead window
  • Critical / near-critical counts
  • Float and percent complete on every row
Three-week lookahead table listing critical activities with start, finish, float, and percent complete
Three-week lookahead over the live critical path.

Pull planning board

Digital sticky notes by day and trade — the pull-planning board your field team already knows, tied back to schedule activities when you want the link.

  • Week-of board with trade colors
  • Stick notes or pick existing activities
  • Promise commitments from the board
Pull planning board with trade-colored sticky notes for logistics, electrical, and concrete across a construction week
Pull board: stickies by day, trade, and commitment.

Weekly work plans & PPC

Last Planner–light weekly work plans: commit to activities, mark them done, and track Percent Plan Complete. Schedule alerts surface finish slips and critical-path movement beside the plan.

  • Weekly commitments with Promise
  • PPC tracking on the plan and in alerts
  • Tied to the same schedule activities as the Gantt
Weekly work plan showing commitments, Percent Plan Complete at 33 percent, and schedule slip alerts
Weekly work plan with PPC and schedule-slip alerts.

Gantt overview, baselines & print

Zoom out for the whole job. Capture baselines, compare as-built vs as-planned, and keep variance visible on the chart. Schedule alerts call out late finishes and critical-path slips before the weekly meeting does. When you need paper, print a multi-page Gantt PDF from the Export menu.

  • Baseline capture and comparison
  • As-built vs as-planned ghosts on the Gantt
  • Claim Digger pairwise comparison
  • RAID register for risks and issues
  • Multi-page Gantt print pack (PDF)
Print-ready Gantt PDF for Riverside Tower with WBS, durations, dates, critical path bars, and baseline overlay
Print pack: multi-page Gantt PDF with critical path and baseline overlay.

Owner share links

Send a read-only, print-friendly link to the owner or CM. They get the live schedule view and can print a Gantt PDF — no account required for guests on a share link.

  • Read-only share links
  • Print PDF / SVG from the share view
  • Trade-scoped updates for subcontractors
  • Mobile-friendly field updates
Owner share view of a construction Gantt with Print PDF control for read-only stakeholders
Share view: read-only schedule with Print PDF for stakeholders.

Also included

Still not a crew dispatch board or a timesheet system. The schedule is the product.

Try it

Walk the sandbox on a demo job, or start a 14-day trial. Pricing is $50 company base + $10 / PM, $5 / superintendent, $0 view-only.

Start a trial Explore sandbox Back to home