Blog / topic
Files, specs & sharing
P6 and MS Project files, schedule specs, and owner reviews. 6 articles.
-
Gantt, Network Diagram, or Line of Balance?
Three ways to look at a construction schedule, what each shows and hides, and which one to use for logic review, field communication, or repetitive work.
-
Moving Schedules Between P6, MS Project, and Everything Else
Which file formats to use when moving a schedule between tools, what survives the trip, what breaks, and how to verify the result before anyone relies on it.
-
P6 .xer Files Explained
What's inside a Primavera P6 .xer file, how its tables fit together, and what to check when you receive one or export one.
-
Reading a Schedule Spec: Section 01 32 16
What Section 01 32 16 usually requires, the clauses that cause trouble later, and a checklist for reading one at bid time or kickoff.
-
Sharing Schedules with Owners and Subcontractors
Who needs which view of the schedule, in what format, how often, and how to keep everyone looking at the same version.
-
What Owners Should Check in a Baseline Schedule Submittal
A practical review checklist for owners and owners' reps: contract compliance, logic quality, the critical path, durations, and how to respond.